Position:Index>>Products
Power Units For Double-scissors Lift 2

Power Units For Double-scissors Lift 2

General Description


Equipped with the zero leakage double-check solenoid valves, this power unit fulfils the complete separation of the two independent circuits,which are respectively for the main platform and subordinate platform of the double scissors lift. By increasing the number of the solenoid vavles,it is easy to get more independent circuits, which are used to control the corresponding cylinders.

 
Outline Dimension

 
 
 
Model Specifications


Special Notes


The power unit is of S3 duty, which can only be worked intermittently, ie., 1minute on and 9 minutes off.
Clean all the hydraulic parts concerned before mounting the power unit.
Viscosity of the hydraulic oil shoud be 15~68 cst,which should also be clean and free of impurities.N46 hydraulic oil is recommended.
This power unit should be mounted vertically.
Check the oil level in the tank after the first start of the power unit.
Change the oil after the first 100 hours of running the power unit, then change the oil every 3000 hours.